Thursday, July 15, 2010

deck, railing and stone wall



The deck is designed to integrate the house with the site. It wraps the house on three sides. To the east the deck is covered by a porch for the front entry. To the south a portion of the deck projects to create a sitting area that takes advantage of the view.

The deck then becomes a narrow walk way leading to the deck on the west. The narrow walkway allows light to penetrate the living space below. New timber posts and existing cedar trees stand side by side.

The Colby Hill landscape Company has just begun work on a stone retaining wall and stone steps. The retaining wall further ties the deck to the site. Stone steps provide a path from between the upper and lower levels.

Friday, July 2, 2010

kitchen cabinets



The kitchen cabinets by local cabinet maker Dan Ober were installed this week.

Monday, June 28, 2010

Wednesday, June 16, 2010

doors and floors


Inside the four panel shaker style doors are hung and the antique heart pine flooring is being installed.

covered porch



The covered porch is complete including the red roof.

deck






Progress on the deck continues.

Sunday, June 6, 2010

porch and painting




While the porch is built on the exterior the painters keep busy inside. The pickled v-groove pine ceiling shows in the foreground of the final photo.